AETHERMINE
SITE 07 · PIT DELTA
01:38:47
SITE UTC-3

OPEN-PIT · UNDERGROUND HYBRID

EXTRACTION COMMAND

Live graphics of Pit Delta — benches, haul roads, and the decline into Gallery 4. Scroll to descend the working face.

11.7kt ore / shift
418m pit depth
2platforms armed

GEOLOGY CUT

BENCH & DECLINE

RL +12m CREST RL -418m FLOOR

SHIFT FLOW

EXTRACTION SEQUENCE

  1. 01

    DRILL & BLAST

    Pattern 4.5m × 5.0m on Bench 12. Charge factor 0.38 kg/t. Misfire interlock armed.

  2. 02

    LOAD & HAUL

    CAT 793F cycle 11.4 min. Crusher pocket 62% live. Stockpile A receiving.

  3. 03

    UNDERGROUND DRIFT

    Gallery 4 heading 214m. Jumbo on pause. Gas envelope monitored by rover.

  4. 04

    AERIAL SURVEY

    Drone grid 40m AGL. Photogrammetry mesh rebuild every 90s over the working face.

PLATFORMS

CHOOSE COMMAND SURFACE

ROVER · UNIT R-04

Tracked chassis in Gallery 4. Chassis IR camera, PPI motion radar, sealed gas bays.

  • Ground IR camera
  • Motion radar PPI
  • CH4 / CO / AQI bays

DRONE · UNIT D-11

Quad over Pit Delta. Nadir optical feed plus live photogrammetry mesh of the benches.

  • Aerial optical feed
  • Live 3D area mesh
  • Survey grid / AGL